STP Restoration & Performance Improvement

350 KLD Sewage Treatment Plant (STP)

Restoration, Revamping & Commissioning

Project Overview

Narmada Water Tech successfully executed the restoration, revamping and commissioning of a 350 KLD Sewage Treatment Plant (STP) to improve treatment efficiency, aeration performance, hydraulic flow, biological treatment and overall plant reliability. The existing STP was experiencing issues related to damaged air grids, accumulated sludge, deteriorated diffusers, old tube media and other mechanical components. The project involved comprehensive cleaning, equipment restoration, aeration system replacement, MBBR media installation, clarifier modification and chemical dosing system installation.

The revamping work was carried out with a focus on improving oxygen transfer, biological treatment efficiency, sludge management and long-term operational reliability.

Major Restoration & Revamping Work

Project Outcome

The restoration and revamping of the 350 KLD STP significantly improved the condition and operational readiness of the existing treatment plant. The upgraded aeration system, new tubular diffusers, MBBR media, air distribution network, clarifier modifications and chemical dosing system provide a more reliable treatment process.

The project demonstrates how systematic STP restoration and process upgradation can improve the performance of an existing plant without requiring complete replacement of the infrastructure.